Leaking or Worn-Out Tub and Shower in Redan, GA? Remodeling Options
A tub or shower that leaks, has loose tile or shows stained, cracked surrounds is telling you the waterproofing has failed. In Redan we can repair the cause, then rebuild the shower or tub area so it stays dry. We start with a free visit and give you a written scope and a quote after the visit.
PROMO CODE: FREECONSULT
Redan bathroom project at a glance
Typical planning figures. Your written scope sets the real schedule and price.
Where the time goes
Typical phase timeline for a bathroom project, in weeks.

Signs of leaking or worn tub and shower in Redan
Redan homeowners usually call us when they notice:
- Water stains on the ceiling below the bathroom.
- Grout is crumbling and tile is loose or hollow sounding.
- The tub or shower floor flexes, cracks or sounds hollow.
- There is a musty smell or soft wall around the tub.
What we do about it
- We visit your home, look at the problem and measure.
- You receive a written scope and a quote after the visit.
- Permits are confirmed with the right office before work starts.
- We build, keep you informed and finish with a walkthrough.
Fixing a leaking or worn tub and shower in Redan
Redan bathrooms are typically small, with a tub and shower combination, a single vanity and dated tile or colored fixtures.
Here is what we work on.
Find the leak before you choose finishes
A leak can come from a failed drain seal, a cracked pan, a bad valve or tile that no longer sheds water. We trace the source, open the wall where needed and check for damaged framing. Picking tile before finding the cause is how new bathrooms fail early.
Waterproofing that works
Modern showers use a continuous waterproof membrane behind the tile, a sloped floor to the drain and sealed corners and niches. A tile surface alone is not waterproof. Getting this layer right is the single most important part of a shower remodel.
Tub, shower or both
Many homeowners replace a tub that is never used with a larger shower. Others keep a tub for children or resale. We show options such as a low curb or curbless shower, a tub shower combination with a tiled surround or a freestanding tub, and explain what each requires.
Repairing damaged framing and subfloor
Slow leaks soften the subfloor and rot the wall framing. We cut out and replace damaged wood before new waterproofing goes in, so the new shower sits on a solid base.
Fixtures, valves and drains
Valves and drains are set before the walls are closed. We choose them with you early so the plumber installs the right rough in and nothing delays the tile work.
What happens next
After a free visit you receive a written scope and a quote. Permits for plumbing and electrical changes are confirmed before work starts.
Typical timeline by phase (weeks)
Ranges are general planning figures. Your schedule is confirmed in writing and depends on selections, lead times and inspections.
More about leaking or worn tub and shower in Redan
Tub to walk in shower
The most requested change; it opens up the room.
Old plumbing
Replace galvanized lines and failing shutoffs while open.
Waterproofing
Modern systems replace old mortar beds.
Ventilation
A fan vented outside prevents mildew.
Vanity and storage
A larger vanity and recessed cabinet add storage.
Floors
We inspect and repair soft subfloor.
Colored fixtures
Replace or reglaze depending on condition.
Next step
After a visit you receive a written scope and quote.
Small baths in Redan ranches
Most Redan bathrooms are original to the house: five by eight feet, a tub and shower combination, a single vanity and a window. Making them work better is about using the space well. A pocket door, a shorter wall hung vanity, a glass panel instead of a curtain and light colored tile all make the room feel larger.
What is behind old tile
Mid-century bathrooms often have mortar beds, metal lath and old drain pipes. When we remove the tile we check the framing, the drain and the vent and tell you what has to be repaired so the new work lasts.
Moisture and mildew
A bathroom with a weak fan and no waterproofing is a mold risk. We replace the fan with a quiet, correctly sized model vented outside and use a continuous waterproofing layer, which protects both the new tile and the structure.
Planning for the long term
Blocking for grab bars, a comfort height toilet and a low threshold shower are inexpensive to add now and keep the room usable as your needs change.
Planning checklist for your bathroom remodel in Redan
Use this list as you plan. Homeowners who work through it tend to make calmer decisions and run into fewer surprises once construction begins.
- Write down your goals, must-haves and nice-to-haves before talking to contractors.
- Set a comfortable budget range and a separate contingency for surprises behind walls.
- Gather photos and inspiration, and note what you like about each so the designer can interpret it.
- Confirm who pulls permits, who schedules inspections and who is your daily point of contact.
- Ask for the scope in writing, including demolition, disposal, protection of your home and cleanup.
- Review the allowance list and decide which selections you will make before work starts.
- Check licensing, insurance and references, and ask to see a recent comparable project.
- Agree on payment milestones tied to completed work, never large payments up front.
- Plan daily life during construction, including pets, children, parking and a temporary space for essentials.
- Walk the finished work with a punch list and keep warranty paperwork in one place.
None of these steps is complicated, but skipping them is how small misunderstandings become expensive delays. If you would like help with any of them, we are glad to walk through the process with you at no obligation.
Questions to ask before you sign
Who handles permits and inspections? How is the shower waterproofed and tested? What happens if we find rot or outdated plumbing? Which items are allowances? What is the warranty? Asking these questions up front is the simplest way to separate a careful contractor from a casual one.
Next step in Redan
The fastest way to a reliable plan is a visit. We walk the space, take measurements, talk through your goals and then send a written quote with the scope, allowances and schedule spelled out. There is no pressure to decide on the spot, and you can use the quote to compare other bids. Call (470) 847-9076 or use the contact page to start.
How long you will be without the bathroom
A typical full bathroom remodel takes a few weeks of on-site work, with most delays coming from backordered tile, vanities or glass. If this is your only bathroom, plan for a temporary arrangement. We sequence the work so the toilet is back in service as early as practical, and we tell you the plan before demolition begins.
Plumbing and hidden conditions
Opening a bathroom wall can reveal old galvanized supply lines, corroded drains or soft subfloor. These surprises are common in older Redan homes. A good contractor explains the possibility up front, gives you a way to price repairs if they appear and shows you photos so you can decide with full information. Updating shutoff valves and supply lines while the walls are open is inexpensive insurance.
Frequently asked questions: leaking or worn tub and shower in Redan
How do I know if my shower is leaking inside the wall?
Stains on the ceiling below, soft or discolored drywall, loose tile and a musty smell are common signs. We can test and open a small area to confirm.
Can I just regrout or recaulk?
That can help with minor surface issues, but it will not fix a failed membrane or pan. We tell you honestly which situation you have.
How long will the bathroom be unavailable?
A hall bath usually takes about two weeks once materials are on site, and a primary bath takes longer. We give a schedule with the quote.
Can you convert my tub to a walk in shower?
Usually yes. We check the drain location, floor framing and wall condition at the visit.
Plan your Redan bathroom remodeling project
Ready to talk bathroom remodeling in Redan? Call (470) 847-9076 for a free visit.