Leaking or Worn-Out Tub and Shower in Loganville, GA? Remodeling Options

A tub or shower that leaks, has loose tile or shows stained, cracked surrounds is telling you the waterproofing has failed. In Loganville we can repair the cause, then rebuild the shower or tub area so it stays dry. We start with a free visit and give you a written scope and a quote after the visit.

Free In-Home Consultation in LoganvilleWe visit, measure, and give you a written scope. No cost, no obligation.
PROMO CODE: FREECONSULT
Claim it: (470) 847-9076

Loganville bathroom project at a glance

Typical planning figures. Your written scope sets the real schedule and price.

Free
In-home consultation
Promo code FREECONSULT. We visit, measure, and talk through your options.
4 to 7 wks
Typical project window
Planning range for a bathroom project in Loganville. Confirmed in writing before work starts.
Written
Scope before work
Itemized scope, material allowances, and schedule on paper.
Direct
Call or text
(470) 847-9076. Book your free visit in Loganville.

Where the time goes

Typical phase timeline for a bathroom project, in weeks.

Design and scope
1 wk
Ordering and prep
2 wks
Demo and plumbing
1 wk
Waterproofing and tile
2 wks
Fixtures and punch list
1 wk
Planning estimate, not a quote. Permit timing in Loganville and material lead times can move these bars.
Bathroom Remodeling project in Loganville, GA

Signs of leaking or worn tub and shower in Loganville

Loganville homeowners usually call us when they notice:

  • Water stains on the ceiling below the bathroom.
  • Grout is crumbling and tile is loose or hollow sounding.
  • The tub or shower floor flexes, cracks or sounds hollow.
  • There is a musty smell or soft wall around the tub.

What we do about it

  1. We visit your home, look at the problem and measure.
  2. You receive a written scope and a quote after the visit.
  3. Permits are confirmed with the right office before work starts.
  4. We build, keep you informed and finish with a walkthrough.

Fixing a leaking or worn tub and shower in Loganville

Most Loganville bathrooms have fiberglass inserts, cultured marble tops and a large garden tub in the primary suite. Updating them changes the feel of the house.

Here is what homeowners ask about.

Find the leak before you choose finishes

A leak can come from a failed drain seal, a cracked pan, a bad valve or tile that no longer sheds water. We trace the source, open the wall where needed and check for damaged framing. Picking tile before finding the cause is how new bathrooms fail early.

Waterproofing that works

Modern showers use a continuous waterproof membrane behind the tile, a sloped floor to the drain and sealed corners and niches. A tile surface alone is not waterproof. Getting this layer right is the single most important part of a shower remodel.

Tub, shower or both

Many homeowners replace a tub that is never used with a larger shower. Others keep a tub for children or resale. We show options such as a low curb or curbless shower, a tub shower combination with a tiled surround or a freestanding tub, and explain what each requires.

Repairing damaged framing and subfloor

Slow leaks soften the subfloor and rot the wall framing. We cut out and replace damaged wood before new waterproofing goes in, so the new shower sits on a solid base.

Fixtures, valves and drains

Valves and drains are set before the walls are closed. We choose them with you early so the plumber installs the right rough in and nothing delays the tile work.

What happens next

After a free visit you receive a written scope and a quote. Permits for plumbing and electrical changes are confirmed before work starts.

Typical timeline by phase (weeks)

Ranges are general planning figures. Your schedule is confirmed in writing and depends on selections, lead times and inspections.

Design and selections2-3 wkOrdering fixtures and tile3-6 wkDemolition1 wkRough-in and waterproofing1-2 wkTile and fixtures1-2 wkFinishes and punch list1 wk

More about leaking or worn tub and shower in Loganville

Replacing the garden tub

A tiled shower with or without a freestanding tub is the usual choice.

Tub to shower in the hall bath

A low threshold shower makes the room easier to use.

Waterproofing

A continuous system behind tile protects the framing.

Fan and ventilation

An exhaust fan vented outside prevents mildew.

Vanity and lighting

A larger vanity and layered lighting update the room.

Floors

We inspect the subfloor before new flooring.

Permits

We confirm the correct office, since the city spans two counties.

Next step

After a visit you receive a written scope and quote.

The Loganville primary bath

The typical primary bath here has a big corner or garden tub, a separate shower, double vanity and a toilet closet. The tub often goes unused while the shower is cramped. Converting the tub area to a large tiled shower with a bench and glass wall usually gives the biggest improvement, and keeping the double vanity keeps the room practical.

Hall baths and kids baths

Tub and shower combinations suit families with children. We can upgrade them with a better tub, a tiled surround, a niche for bottles and a durable floor, or replace the tub with a shower if the household no longer needs it. We help you decide based on how the room is used.

Plumbing and fixtures to choose early

Valves are set before walls are closed, so the shower system, handheld sprayer and diverter need to be chosen early. We list them in the scope so nothing is delayed waiting for fixtures.

Lighting and mirrors

Light bars over the mirror cast shadows. Sconces beside the mirror, a recessed light over the shower and a dimmer give even light and make the room feel bigger. We confirm outlets and add GFCI protection as part of the electrical work.

Planning checklist for your bathroom remodel in Loganville

Use this list as you plan. Homeowners who work through it tend to make calmer decisions and run into fewer surprises once construction begins.

None of these steps is complicated, but skipping them is how small misunderstandings become expensive delays. If you would like help with any of them, we are glad to walk through the process with you at no obligation.

Questions to ask before you sign

Who handles permits and inspections? How is the shower waterproofed and tested? What happens if we find rot or outdated plumbing? Which items are allowances? What is the warranty? Asking these questions up front is the simplest way to separate a careful contractor from a casual one.

Next step in Loganville

The fastest way to a reliable plan is a visit. We walk the space, take measurements, talk through your goals and then send a written quote with the scope, allowances and schedule spelled out. There is no pressure to decide on the spot, and you can use the quote to compare other bids. Call (470) 847-9076 or use the contact page to start.

How long you will be without the bathroom

A typical full bathroom remodel takes a few weeks of on-site work, with most delays coming from backordered tile, vanities or glass. If this is your only bathroom, plan for a temporary arrangement. We sequence the work so the toilet is back in service as early as practical, and we tell you the plan before demolition begins.

Plumbing and hidden conditions

Opening a bathroom wall can reveal old galvanized supply lines, corroded drains or soft subfloor. These surprises are common in older Loganville homes. A good contractor explains the possibility up front, gives you a way to price repairs if they appear and shows you photos so you can decide with full information. Updating shutoff valves and supply lines while the walls are open is inexpensive insurance.

Frequently asked questions: leaking or worn tub and shower in Loganville

How do I know if my shower is leaking inside the wall?

Stains on the ceiling below, soft or discolored drywall, loose tile and a musty smell are common signs. We can test and open a small area to confirm.

Can I just regrout or recaulk?

That can help with minor surface issues, but it will not fix a failed membrane or pan. We tell you honestly which situation you have.

How long will the bathroom be unavailable?

A hall bath usually takes about two weeks once materials are on site, and a primary bath takes longer. We give a schedule with the quote.

Can you convert my tub to a walk in shower?

Usually yes. We check the drain location, floor framing and wall condition at the visit.

Plan your Loganville bathroom remodeling project

Ready to talk bathroom remodeling in Loganville? Call (470) 847-9076 for a free visit.